Asphalt Paving contractors near Billings, MT

1 pros · sorted by featured, then Google rating

One asphalt paving company serves the Billings area, and each listing below shows the business's real contact details straight from its public profile. It holds Google ratings — averaging 3.7 stars across 3 customer reviews. Featured pros are established businesses we work with directly. Call the pro directly or use their website to request a quote — HomePal never sells your info.

Asphalt Paving Concrete

H L Ostermiller Construction

★3.7(3) on Google Serves Billings, MT
ConcreteAsphalt Paving

Ostermiller Construction is a concrete and asphalt contractor based in Shepherd, Montana, working across Billings and the Yellowstone Valley. The crew handles both trades under one roof: con

How much does asphalt paving cost?

An asphalt driveway costs $5 to $12+ per square foot installed — about $2,000 to $4,800 for a 20' x 20' driveway.

Read the full 2026 cost guide →

Hiring asphalt paving pros in Billings: what to know

How do I choose an asphalt paving company in Billings?

Base preparation decides how long a driveway lasts — ask what base depth and compaction they build, and what mix and lift thickness they lay. Established companies with their own paver and roller, insurance, and local references beat any door-knock 'leftover asphalt' offer, which is a classic scam.

What's the difference between paving, resurfacing, and sealcoating?

Paving is new asphalt over a prepared base; resurfacing (an overlay) adds a new lift over structurally sound existing asphalt; sealcoating is a protective surface treatment, not a repair. Sealcoating a failing driveway just paints the problem black — match the fix to the condition.

How long before I can drive on new asphalt?

Typically you can walk on it within a day and drive within two to three, but full cure takes months — avoid sharp steering in place and heavy loads early on. Your contractor should give timing based on the weather at the pour.

When should asphalt be sealed, and how often?

First sealcoat usually comes six months to a year after paving (asphalt needs to cure first), then every two to four years depending on sun and traffic. Annual sealing is oversell; never sealing lets water age the surface faster.